Holgate Lumber Company

March 18, 2009

Evers Build • Waldron, Mi • Update March 2009

Filed under: Under Construction — bwaisne @ 2:24 pm

Spring has come and the walls are up…

a1 a2
a3 a4
a5 a6
a7 a8
a9 a10_1
a11 a15
a13 a14
a16 a16_1
a17 More to come…

March 11, 2009

Energy Tax Credit for 30% of the product

Filed under: News and Updates — bwaisne @ 1:49 pm
Tags: , ,

A stimulus rebate you can use! 2009/2010 Energy Efficiency Tax Credit The American Recovery and Reinvestment Act modifies and extends federal tax credits for eligible building components that improve energy efficieny. Call Holgate Lumber to find out more information.

Eligible windows and door must have both a U-factor equal or less than 0.30 and a solar heat gain coefficient (SHGC) equal or less than 0.30.

You can become eligible to receive a 30% credit of the product cost! Call 419-264-2331 for more information.

Only Sunrise Windows and Sliding Doors meet these standards today! Only Holgate Lumber and Buckeye Building Solutions carry them in the area.

Call today. Invest in tomorrow. Take advantage of stimulus savings! email: holglmbr@holgatelumber.com

March 3, 2009

Evers Build • Michigan • Waldron, Michigan

Filed under: Under Construction — bwaisne @ 10:41 pm

Timber Frame Construction • Ground Broken November 2008 with projected completion August 2009. Follow the In February 2006 approximately 50 ash trees were cut from Jerry’s, Jack’s, and Dad’s woods. In the spring, paths were cleared and logs were hauled.
– Spring 2007, logs were taken to Tervol’s Wood products.
– Spring 2008, logs were cut into timber and 1″ boards cut and kiln dried
– Timbers were hauled to Cruse Hardwood to be planed
– Boards hauled to Saunders Lumber Company to be made into trim, tongue & groove boards
– Early summer 2008, timbers hauled to Heartwood Craft to have timber frame layed out, mortise & tenon cut
– Mid November 2008, ground broken for basement by Miller Construction
– Followed by Superior Wall Company
– In floor radiant heat tubing laid in by Hammontree (Ohio Radiant Floor)
– Insulation. wire mesh, and tubing tied by Jerry, Diana, and Dad
– Miller construction poured basement floor in December 2008
Holgate Lumber/Waisner Construction install I joist and subfloor on top of basement walls, raised timbers.
– Tongue and groove boards sanded by Jery, Diana, & Dad (with minor to little blood loss)
– stained by Holgate Lumber Company

The groundbreaking HLC Build
laying radiant heat 10018271
1001900 1001961
HLC building at the shop 1001949
1001981 1001976
1002036 10019871
1002058 1002061
1002059 1002063
1002065 1002054
1002067 1001936
HLC Building Waisner Construction So Far So Good…

March 2, 2009

Hello world!

Filed under: Under Construction — bwaisne @ 10:31 pm

Welcome to Holgate Lumber Company’s Blog . Follow current and past construction, latest news, and additions to Northwest Ohio’s best kept secret.